MWMS Brain

Experimentation Brain Test Lifecycle Model

Parent: Experimentation Brain
Destination: mwmsbrain.site
Page Type: Operational Flow Page
Source of Truth: MCR


Purpose

Test Lifecycle Model defines the full journey of a test from idea to final decision.

This page ensures tests are run in a structured sequence and not abandoned or misinterpreted.


Lifecycle Overview

Every test must follow this flow:

  1. Test Approved
  2. Test Prepared
  3. Test Launched
  4. Data Collected
  5. Results Reviewed
  6. Decision Made
  7. Learning Captured

Stage 1 — Test Approved

Use this stage when:

  • Affiliate Brain approves opportunity
  • Testing Readiness Criteria is complete

Stage 2 — Test Prepared

Confirm:

  • hypothesis defined
  • budget set
  • tracking working
  • campaign structure ready
  • success and failure signals defined

Stage 3 — Test Launched

Confirm:

  • campaign is live
  • traffic is flowing
  • spend is controlled
  • early signal monitored

Stage 4 — Data Collected

Confirm:

  • sufficient data collected
  • tracking is accurate
  • no major technical issues

Stage 5 — Results Reviewed

Use:

Campaign Review Protocol

Check:

  • performance metrics
  • traffic quality
  • funnel behaviour
  • tracking reliability

Stage 6 — Decision Made

Choose one:

  • Continue
  • Adjust
  • Retest
  • Stop
  • Prepare For Scaling

Stage 7 — Learning Captured

Send results to:

Research Brain Test Learning And Signal Capture Framework


Rule

Do not skip lifecycle stages.

Incomplete lifecycle = unreliable decisions.

MCR remains the source of truth.