Document Type: Working Note
Status: Active Working Note
Version: v1.0
Authority: MWMS
Last Reviewed: 2026-04-07
Purpose
This page clarifies the role each key lifecycle page performs inside the Affiliate flow.
It exists to prevent wiring confusion and ensure each page has a clear structural responsibility.
This page does not change any page structure.
It only clarifies functional roles.
Lifecycle Roles
Opportunity Queue
Initial holding area for potential opportunities awaiting structured evaluation.
Offer Intelligence
Primary structured evaluation record capturing viability signals, risk signals, and performance potential of an opportunity.
Velocity Decision Engine
Determines how quickly an opportunity should move through testing phases based on signal strength and confidence level.
Phase 4 Structured Testing Protocol
Defines controlled testing structure used when an opportunity demonstrates sufficient validation signals.
Stage Progression Protocol
Defines the allowed movement rules between lifecycle stages.
Scaling Readiness Indicators
Signals used to determine whether an opportunity is approaching scaling viability.
Affiliate to Finance Decision Bridge Logic
Defines when an opportunity requires financial governance review before expansion.
Controlled Scaling Protocol
Defines the structure used to increase exposure while protecting capital stability.